Hall Systems Construction

By single-aisle halls to the high Hall in Hall construction works Hall construction, have the purpose to wrap large spaces as supports free and allow multiple uses, such as industrial buildings, prefabricated halls, warehouses and industrial halls. Halls usually with prefabricated elements are created due to high heights and spans, as well as a short Assembly times. Especially the precast concrete construction has prevailed more in recent years, because he allows to realize long-span structures through the locking bed preload. Two more common Hall construction types are the wood and the steel construction. The most buildings of the Hall in the industrial and commercial construction differ in their external appearance but only slightly.

The major differences of the constructions are in the support systems of the building. It can be distinguished between five major indoor systems. Single-nave Hall represents the standard Hall the single-nave Hall. Make sure the roof drainage, such are halls usually with With a roof slope of 3-5% used saddle roof trusses. Special spans are in the range from 12 to 24 m. The shipping cost of the binder rise sharply from 30 metres and spans over 40 m need special constructions.

Two-Aisled halls as opposed to the single-aisle Hall used the two-Aisled Hall at larger bases. The roof slope to ensure the roof drainage can be generated through the support of the middle of the Hall with two parallel ties in the gap. The binder stored up often on interception carrier, to allow greater support distances. According to this principle, the creation is possible more nave halls. Hall with ceiling this kind of Hall is required if, for example, a cellar as storage space is required. The ceiling is made usually with element plates on beams. When choosing a suitable ceiling system must also not static loads on the false ceiling, such as, for example, forklift transport, factored be. Hall with crane runway a Hall with crane runway is usually required when heavy loads have to be transported in or out of the Hall. This is the case for example with production halls. The crane moves on crane rail systems, which are mounted on side supports. This, it should be noted that the support must include both vertical and horizontal loads from the crane operation. High Hall as high halls referred to Hall buildings, whose heights exceed 10 m. This is to be expected with relatively large deformations of the support head. In some cases, a shear-resistant roof washer is required to avoid damage to the facade and in the transition to the roof covering. To decide for the Hall type best suited to a project, it is sense by Hall construction experts consult. They can bring their knowledge and their experience, to ensure an optimal planning and implementation of any construction project.

This entry was posted in News and tagged . Bookmark the permalink.

Comments are closed.